piper’s hill

Trail build report: pot hole fixing & wood moving on Piper’s hill

The aim of this build day was to fill potholes and puddles using material  from bags that had been filled on the previous build day.  We also wanted to move logs from the recent forestry operations to ensure that the contractor didn’t have to drive over the trail to collect them. We’d walked the trail […]

Trail build report: pot hole fixing & wood moving on Piper’s hill Read More »

Trail build report…alley surfacing and some fence work

This was a short build session. The entrance to the alley section was resurfaced after being hammered by the recent Prospect Hospice ride. Jon Proudman was cycling past and stopped to help. The alley was surfaced in Oct 2010, exit mods on 5th Dec 2010 surfaced Jan 2011 and the final link in Dec 2011.  A fence was built on Piper’s hill next

Trail build report…alley surfacing and some fence work Read More »