Trail build report…alley surfacing and some fence work

This was a short build session. The entrance to the alley section was resurfaced after being hammered by the recent Prospect Hospice ride. Jon Proudman was cycling past and stopped to help. The alley was surfaced in Oct 2010, exit mods on 5th Dec 2010 surfaced Jan 2011 and the final link in Dec 2011

A fence was built on Piper’s hill next to Pete’s steps.

Full build diary.

Leave a Comment

Your email address will not be published. Required fields are marked *