Bonus trail build session (half day).

We made massive progress at the recent build days (trail patching Sat and Sun plus some drainage work  2 3).  We want to meet up for a few hours  and shift some material that’s ready to go in the triangle area…right where it says “stockpile” in the photo below.  (This session is in place of the postponed

Bonus trail build session (half day). Read More »

Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek

This was a follow on from our initial drainage work and the nocturnal digging session the previous evening. At 1:30pm we had Phil Mayger, Jerome Crametz and myself (Tom) ready to dig a canal. We found Chris Hopkinson wandering around the trail and he joined us. We linked the ditch that I’d dug the previous evening with

Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek Read More »

Trail build report: Sat 29th Dec 2012 – OCD work (start, mway, east side,triangle)

This was a bonus build session on the Saturday after Christmas. When I arrived at the special festive late start time of 11am then I found Phil Mayger, Phil Allum, Jez, Gary Palmer and Shaun Carolin standing in the rain raring to go. After the heavy rain then we found plenty of OCD  (obsessive compulsive

Trail build report: Sat 29th Dec 2012 – OCD work (start, mway, east side,triangle) Read More »

Trail build report: Sun 16th Dec 2012 – trail patching Piper’s and North side

We’d made good progress on the previous day – more than half the 20 tonne pile of material had been shifted. Our plans for this day were to patch up more trail on the north side of the pitch and to move material to the triangle area using Rafe and his Land Rover. Things started at

Trail build report: Sun 16th Dec 2012 – trail patching Piper’s and North side Read More »