Trail build report: Sat 14th Jan 2012, Triangle surfacing
The temperature gauge in my car was showing minus 4.5 degrees C as I drove round Cirencester at 8:15am on Saturday morning. It was cold and it was dry. Cold and dry doesn’t feel as cold without dry. There was a frost but the ground wasn’t frozen. Streaming sunlight had fixed that. Brandon Hire dropped […]
Trail build report: Sat 14th Jan 2012, Triangle surfacing Read More »