Trail build report: Sat 10th Sept 2011

Raised plank at Croft Trail in Swindon.

This was a low-key build afternoon. Jez has been working on the optional north shore style loop for a few months now. This is going to provide an interesting bonus for confident riders.

We’ve got three large telegraph pole style logs to use. The top surfaces of these has been routed out to give a cross hatch pattern.

When I arrived then Jez had already raised the first log into position. This one is going to have a small drop onto the second log.

Jez and myself then spent an hour moving the third large log into place. This is going to form part of the raised section.

Recent trail build updates:

Leave a Comment

Your email address will not be published. Required fields are marked *