Trail build report: 30 people, 20 tonnes (start, exit, mway1, east side)

See the complete Croft trail build diary. After low key build days in December (triangle surfacing) and January (triangle woodwork) we had a big day planned. Twenty tonnes of build materials had been delivered on Thursday morning: half a tonne of gabion (rocks) and 19.5 tonnes of type 1 limestone. Our target was to shift all of this […]

Trail build report: 30 people, 20 tonnes (start, exit, mway1, east side) Read More »

Trail build report…alley surfacing and some fence work

This was a short build session. The entrance to the alley section was resurfaced after being hammered by the recent Prospect Hospice ride. Jon Proudman was cycling past and stopped to help. The alley was surfaced in Oct 2010, exit mods on 5th Dec 2010 surfaced Jan 2011 and the final link in Dec 2011.  A fence was built on Piper’s hill next

Trail build report…alley surfacing and some fence work Read More »