Skip to content
Mountain Biking Swindon
  • Events
  • Croft Trail
  • Contact Us
Menu Close
  • Events
  • Croft Trail
  • Contact Us

Trail build report: triangle resurfacing

  • Post author:Tom
  • Post published:December 14, 2013
  • Post category:Croft Diary
  • Post comments:0 Comments

This was our last build day of the year. The plan was to fix and resurface a few muddy patches in the triangle using material that we'd moved on the…

Continue ReadingTrail build report: triangle resurfacing

Trail build report: trail fixing (pond, North side, mway1, woodwork)

  • Post author:Tom
  • Post published:November 10, 2013
  • Post category:Croft Diary
  • Post comments:1 Comment

Our target for the day was to fix potholes and resurface patches of trail using material that had been shifted the previous day.  Once again, it was a nice change to…

Continue ReadingTrail build report: trail fixing (pond, North side, mway1, woodwork)

Trail build report: Sat 10th March – various resurfacing jobs & signs

  • Post author:Tom
  • Post published:March 10, 2012
  • Post category:Croft Diary
  • Post comments:0 Comments

This was a bonus trail build day. The aim was to finish off various jobs ready for our open day on the 1st April 2012. We'd made great progress on…

Continue ReadingTrail build report: Sat 10th March – various resurfacing jobs & signs

Trail build report: Sun 4th March – triangle entrance and resurfacing

  • Post author:Tom
  • Post published:March 4, 2012
  • Post category:Croft Diary
  • Post comments:0 Comments

Saturday had been a sunny spring day. Sunday was different; it was raining at 10am when we arrived. Phil and myself (Tom) made a start on the berm for the…

Continue ReadingTrail build report: Sun 4th March – triangle entrance and resurfacing

Trail build report: Sat 3rd March – gravel shifting and resurfacing

  • Post author:Tom
  • Post published:March 3, 2012
  • Post category:Croft Diary
  • Post comments:0 Comments

These special artistic effects were produced by using a very low spec camera on a phone (Nokia C1-01). It was finally looking like spring on Saturday morning at 9am when…

Continue ReadingTrail build report: Sat 3rd March – gravel shifting and resurfacing
Copyright [oceanwp_date] - MB Swindon