Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek
This was a follow on from our initial drainage work and the nocturnal digging session the previous evening. At 1:30pm we had Phil Mayger, Jerome Crametz and myself (Tom) ready to dig a canal. We found Chris Hopkinson wandering around the trail and he joined us. We linked the ditch that I’d dug the previous evening with […]
Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek Read More »