drainage

Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek

This was a follow on from our initial drainage work and the nocturnal digging session the previous evening. At 1:30pm we had Phil Mayger, Jerome Crametz and myself (Tom) ready to dig a canal. We found Chris Hopkinson wandering around the trail and he joined us. We linked the ditch that I’d dug the previous evening with […]

Trail build report: Sat 5th Jan 2013 – east side drainage & triangle tweek Read More »

Trail build report: Sat 29th Dec 2012 – OCD work (start, mway, east side,triangle)

This was a bonus build session on the Saturday after Christmas. When I arrived at the special festive late start time of 11am then I found Phil Mayger, Phil Allum, Jez, Gary Palmer and Shaun Carolin standing in the rain raring to go. After the heavy rain then we found plenty of OCD  (obsessive compulsive

Trail build report: Sat 29th Dec 2012 – OCD work (start, mway, east side,triangle) Read More »