Trail build report: 7th Dec 2008 – South side continued

We’d used the Land Rover to move the red type one stone to the South side of the pitch on the previous day.

When we arrived then the piles of gravel had frozen solid and we had to smash them to get them moving. Phil and myself spent the day raking out the material and finishing off this new section.

We also helped build some of the woodwork in the triangle. This was removed in October 2010 when the triangle was closed for redevelopment (October 2010 news).

See the build report from Dec 2011 when this section was done properly.

Raking out red gravel at the Croft Trail in Swindon.