Trail build report: 13th Sept 2009

We tidied up the trail on the South side of the pitch. This was originally build in December 2008. The line was straightened out a bit and a new berm was built in place of a tight corner round a tree.

Meanwhile, on the North side of the pitch another pointless corner was removed.

Finally we rationalised some of the the sign posts.

See the build report from Dec 2011 when this section was done properly.

Building a berm at the Croft Trail in Swindon.
New trail line at Croft Trail in Swindon. Improved sign posts at Croft Trail in Swindon, Wiltshire.