turnout

Trail build report: Sat 3rd March – gravel shifting and resurfacing

These special artistic effects were produced by using a very low spec camera on a phone (Nokia C1-01). It was finally looking like spring on Saturday morning at 9am when Brandon Hire delivered the compactor (whacker). Jez brought the tools round and I kept myself entertained fixing the puncture on one of the wheel barrows

Trail build report: Sat 3rd March – gravel shifting and resurfacing Read More »