Trail build report: 13th Sept 2009
We tidied up the trail on the South side of the pitch. This was originally build in December 2008. The line was straightened out a bit and a new berm…
Continue Reading
Trail build report: 13th Sept 2009
We tidied up the trail on the South side of the pitch. This was originally build in December 2008. The line was straightened out a bit and a new berm…
We'd used the Land Rover to move the red type one stone to the South side of the pitch on the previous day. When we arrived then the piles of…