piper’s

Trail build report: 14th Dec 2008 – flood. Rock moving to Piper’s hill

A deluge of rain meant that some of the woodwork section had floated away. We spent the morning retrieving the missing sections. We tackled the source of the problem by removing overgrown trees from the banks of the river. (At a later date the council came along and cut a massive branch away downstream and

Trail build report: 14th Dec 2008 – flood. Rock moving to Piper’s hill Read More »