20 tonnes delivered to the trail
Earthline delivered another mixed load of 18 tonnes of type 1 limestone and 2 tonnes of gabion (rocks). This was moved over the next two build days: Saturday Sunday See our complete build diary.
Earthline delivered another mixed load of 18 tonnes of type 1 limestone and 2 tonnes of gabion (rocks). This was moved over the next two build days: Saturday Sunday See our complete build diary.
Earthline delivered 20 tonnes of material to the trail today: 17 tonnes of type limestone and 3 tonnes of 100mm down rocks. We’ll be shifting this lot over the next two days. If you’ve got any spare time this weekend then please come and help us! There are also two build days in October. List …
Earthline delivered 20 tonnes of type 1 limestone to the car park today. This is going to be shifted on the upcoming trail build day (our trail build days are always listed on the events page). It’s going to be used to finish of the triangle entrance and for resurfacing jobs (west side of pitch, …
Trail build report: 1st March 2012 – 20 tonnes delivered Read More »
Earthline delivered another 20 tonnes of limestone at the trail today. This will be used to finish the triangle section on the upcoming build days (see our events calendar for build days). I’ll add up how much we got through last year soon. I think it’s over 100 tonnes. Trail build update page.
Earthline delivered another 20 tonnes of type 1 limestone. This was earmarked for the trail on the East and South sides of the pitch. See the build day report from Sunday 27th Novemeber.
Earthline have delivered another 30 tonnes of type-1 limestone chippings to the triangle area. This will be used to surface more of the new trail in that area – it’s almost 1km with this project including 2 new bridges, a load of woodwork and a lot of berms and rollers.
Earthline have delivered another 20 tonnes of type-1 limestone chippings to the triangle area. This will be used to surface more of the new trail in that area – it’s almost 1km with this project including 2 new bridges, a load of woodwork and a lot of berms and rollers. See our recent build reports: …
Trail build update: another 20 tonnes of chippings Read More »
We had 60 tonnes of chipped limestone and 10 tonnes of mud delivered to the trail (20 to triangle, 20 to Piper’s hill and 20 to car park). Our supplier Earthline used their 10 tonne truck to drop the material inside the site very close to where we planned to use it. This will save …