Trail build: Fri 9th Dec 2011- 20 tonnes delivered
Earthline delivered another 20 tonnes of type 1 limestone. This was earmarked for the trail on the East and South sides of the pitch. See the build day report from Sunday 27th Novemeber.
Earthline delivered another 20 tonnes of type 1 limestone. This was earmarked for the trail on the East and South sides of the pitch. See the build day report from Sunday 27th Novemeber.
Earthline have delivered another 30 tonnes of type-1 limestone chippings to the triangle area. This will be used to surface more of the new trail in that area – it’s almost 1km with this project including 2 new bridges, a load of woodwork and a lot of berms and rollers.
Earthline have delivered another 20 tonnes of type-1 limestone chippings to the triangle area. This will be used to surface more of the new trail in that area – it’s almost 1km with this project including 2 new bridges, a load of woodwork and a lot of berms and rollers. See our recent build reports: …
Trail build update: another 20 tonnes of chippings Read More »
We had 60 tonnes of chipped limestone and 10 tonnes of mud delivered to the trail (20 to triangle, 20 to Piper’s hill and 20 to car park). Our supplier Earthline used their 10 tonne truck to drop the material inside the site very close to where we planned to use it. This will save …