Archive for September, 2009

Trail build report: 13th Sept 2009

Sep 13th 2009 Croft Diary

We tidied up the trail on the South side of the pitch. This was originally build in December 2008. The line was straightened out a bit and a new berm was built in place of a tight corner round a tree. Meanwhile, on the North side of the pitch another pointless corner was removed. Finally [...]