Archive for October, 2008

Trail build report: 25th Oct – moving red gravel

Oct 25th 2008 Croft Diary

This was before we had any Land Rover enthusiasts to help us and before we started using the power barrow (Muck Truck). So we had to handball material using wheel barrows. As you can see from the photograph we were already looking for ways of making the job easier.The material was type 1 road building [...]

Trail build report: 19th Oct – route cutting on East side

Oct 19th 2008 Croft Diary

We were joined on this build day by Kate and James. The diary is sketchy – it looks like we tweeked the trail on the north east corner, adding what we call the “roller coaster” corner. We then moved down the east side cutting the trail to the pond and round the section there. Most [...]

Trail build report: 18th Oct – route cutting on East side

Oct 18th 2008 Croft Diary

This was another early trail build day with just Phil and Tom present. We continued cutting out a route in the woods on the East side of the pitch. None of this was ever used – we went for a more direct line as a temporary measure and that was then adopted as the proper [...]

Trail build update: 16th Oct 2008

Oct 16th 2008 Croft Diary

It’s still early days on the trail and the current aim is to get the basic route finished. Some of the route is a bit bare, and there’s not enough features on it yet, but that will all be sorted in the fullness of time. The aim is add more raised woodwork, bermed corners, jumps [...]

Trail build report: 12th Oct – route cutting on North and East side

Oct 12th 2008 Croft Diary

This was a trail build day with just Phil and Tom present. We carried on cutting out the new line on the North side of the pitch and also cut a load of new route on the East side. The North part was tweeked slightly on later build days: a section was moved further up [...]

Trail build report: 11th Oct – route cutting on North side

Oct 11th 2008 Croft Diary

This was a build evening for Phil and Tom. When we arrived then the basis of a route on the North side of the pitch had already been marked out by Steve Smith and his wife. They were responsible for the trail at that time, relinquishing this to Phil in early 2009. We quickly reached [...]